Sunny day installation of NIMBUS Advanced Process Cooling Hybrid Adiabatic Coolers by the team at AME Consulting Group and Quadra Mechanical Ltd at the Centerm Expansion Project at the Port of Vancouver.
- Frames are full 316L Stainless Steel Construction.
- Does not rely on reservoir of standing water — eliminating a primary breeding ground for Legionella bacteria and winter sump freezing.
- Use Domestic Water Pressure for Nozzles (No pump stations required).